Due to essential electrical works a complete power shutdown is required to the JKCC at Merchiston Campus on Saturday 15 November 2014 between the hours of 6-10am. There will be no access permitted to the JKCC during this period.
During this time alternative PC facilities will be available within the 24 hour study space within Zone 1 of Merchiston Library.